Fenno Wellhouse Replacement
Owner:
Upper Eagle River Water Authority
Engineer:
SGM
Project Description:
Traditional Bid
Cost: $2,183,264
Project Description
An existing pump station had reached the end of its useful life and a new pump station needed to be constructed in its place. RN demolished the existing facilities and constructed a new pump station in a gated community.
The new pump station has raw water intake piping, chemical injection, a chlorine contact basin, and vertical turbine discharge pumps.
The project required close coordination with operations to successfully startup the new facility.