Fenno Wellhouse Replacement

Owner:

Upper Eagle River Water Authority

Engineer:

SGM

Project Description:

Traditional Bid
Cost: $2,183,264

Project Description

An existing pump station had reached the end of its useful life and a new pump station needed to be constructed in its place. RN demolished the existing facilities and constructed a new pump station in a gated community.

The new pump station has raw water intake piping, chemical injection, a chlorine contact basin, and vertical turbine discharge pumps.

The project required close coordination with operations to successfully startup the new facility.