Town of Silt Wastewater Treatment Facility and Interceptor Project
Owner:
Engineer:
Project Description:
Type: Traditional Bid
Cost: $4,100,000
Project Description
RN Civil Construction was the general contractor for the construction of the Town of Silt’s new wastewater treatment facility. The project consisted of a new wastewater treatment facility and interceptor. The treatment plant included a pretreatment building, secondary treatment utilizing an Aero-Mod system, ultra violet disinfection and sludge treatment. Construction of the plant required extensive dewatering due to it’s location next to the Colorado river. The project also included construction of 3500 LF of a 18” interceptor and 2000 LF of a 12” water line to serve the new treatment plant. The interceptor consisted of 3000 LF of 18” PVC pipe. Much of the pipeline required over excavation of unsuitable material and restabilization of the trench bottom.