Zone 5 Pump Station

Owner:

City of Arvada

Engineer:

Dewberry

Project Description:

Traditional Bid
Cost: $2,488,939

Project Description

RN constructed a new pump station on drilled piers. Special care was taken by the project team to ensure the new pump station matched the architectural features of the existing water treatment facility immediately adjacent to the site.

Process consisted of three new 250hp vertical turbine pumps were installed in pump cans and associated piping and instrumentation. New electrical gear and a standby generator were installed at the pump station.

Close coordination was required between RN, the Owner, and engineer, to successfully tie in the pump station to the existing distribution lines.

back to project portfolio